Construction Gallery
Page 4

With the roof sheathing

Note the settling space left above all the doors and windows

The first log siding is applied to the east side; the middle section to follow. You can see the siding hadn't been exposed to the elements yet.

Great Room ceiling before the tongue-and-
groove is applied, with 12" of insulation.

We decided we really needed a pergola.  It looked too much like the suburbs to me.

As the tongue-and-groove went up, we decided it had to be stained!


[1]  [2]  [3]  [4]  [5]  [6]  [7]  [8]  [9]  [Next]


Barna Log Homes   -   Adventure Log Cabins   -   Construction Photos   -    Contact Us   -   Products & Services   -  
Helpful Articles   -   Real Estate  -  Site Map  -  Home
 

Jersey Log Homes
167 Locktown-Flemington Rd., Flemington, NJ  08822   
Ph: 908-284-4986      Email  mhayes@patmedia.net